| Work began this fall to add a 24' x 36' addition to the Junction. Below you can see the foundation footings are in place and the floor joists are being installed. | |
|
| |
|
North Holt Electric set 17 piers which will support three 2" x 10" by 36 foot beams for the floor support. The beams were made by club members out of twenty-seven 2" x 10" x 12's with 3/4 inch CDX plywood sandwiched between the 2 x 10s. | |
We had a great turnout to help with this project. Many thanks to Loren Able of Northland Community College and his carpentry class for helping with the floor joists. | |
The floor joists done, ready to install the decking. | |
Work begins on the walls | |