Full size caboose restored and on standard gauge track at the junction

 

Casey Holt Junction Expands

Page:  1 2

Work began this fall to add a 24' x 36' addition to the Junction. Below you can see the foundation footings are in place and the floor joists are being installed.

 

caboose arrival

North Holt Electric set 17 piers which will support three 2" x 10" by 36 foot beams for the floor support. The beams were made by club members out of twenty-seven 2" x 10" x 12's with 3/4 inch CDX plywood sandwiched between the 2 x 10s.

We had a great turnout to help with this project. Many thanks to Loren Able of Northland Community College and his carpentry class for helping with the floor joists.

The floor joists done, ready to install the decking.

Work begins on the walls